คำอธิบาย
What Is the DAXIN 3H3 80kVA 3/3 Phase Online UPS?
The DAXIN 3H3 80kVA is an 80kVA/64kW low-frequency online UPS designed for critical applications requiring three-phase input and three-phase output power protection.
Its 3/3 phase architecture is intended for facilities where both the incoming electrical supply and protected critical loads operate on three-phase power.
The reference configuration supports 380/400/415VAC three-phase input and output, 0ms mains-to-battery transfer and greater than 90% efficiency.
Battery configuration, bypass, communications, redundancy requirements and other project parameters should be confirmed according to the connected load, required backup time and approved DAXIN technical proposal.
ประโยชน์หลัก
- 80kVA / 64kW Capacity: Designed for high-capacity critical three-phase loads in industrial and infrastructure applications.
- 3/3 Phase Architecture: Three-phase input and three-phase output support large three-phase electrical systems.
- Low-Frequency UPS Design: Intended for demanding industrial and infrastructure critical-power applications.
- Online Power Protection: Provides conditioned power for sensitive and mission-critical loads.
- 0ms Mains-to-Battery Transfer: Maintains output during utility-to-battery transition according to the reference specification.
- Configurable Battery System: Battery configuration and runtime can be engineered according to load and backup-time requirements.
- Monitoring and Protection: Display, alarm, protection and communication functions support system operation and maintenance.
- การตั้งค่าตามโครงการ: Parallel, redundancy, bypass and communication capabilities must be confirmed for the selected configuration.
What Does 3/3 Phase Mean in a UPS?
A 3/3 phase UPS uses three-phase AC power at the input and supplies three-phase AC power at the output.
This configuration is commonly used for medium- and high-capacity critical loads in data centers, industrial facilities, telecom infrastructure, healthcare systems and other facilities operating three-phase electrical equipment.
The DAXIN 3H3 80kVA uses this three-phase input and three-phase output architecture for critical-power applications requiring 80kVA-class UPS capacity.
What Loads Can an 80kVA UPS Support?
The DAXIN 3H3 80kVA reference model is rated at 80kVA / 64kW. The actual equipment that can be supported depends on the combined active power, power factor, startup or peak demand and required operating margin of the connected loads.
UPS sizing should be based on measured or calculated load data rather than equipment quantity alone. Future expansion and required battery runtime should also be considered during system design.
ข้อมูลจำเพาะหลัก
DAXIN 3H3 80kVA Key Specifications
| พารามิเตอร์ | 3H3-80kVA |
|---|---|
| ความจุที่กำหนด | 80kVA / 64kW |
| เฟส | Three-Phase Input / Three-Phase Output |
| แรงดันไฟฟ้าเข้า | 3×380 / 400 / 415VAC |
| ช่วงแรงดันไฟฟ้าเข้า | 285–475VAC |
| ความถี่ของข้อมูลเข้า | 46–54Hz @ 50Hz; 56–64Hz @ 60Hz |
| แรงดันไฟฟ้าขาออก | 380 / 400 / 415VAC |
| ความถี่ในโหมดใช้แบตเตอรี่ | 50/60Hz ±0.1Hz |
| THD ของสัญญาณออก | <3% Linear / <5% Non-linear |
| การเปลี่ยนจากระบบไฟฟ้าหลักไปยังแบตเตอรี่ | 0 มิลลิวินาที |
| ประสิทธิภาพ | >90% |
| ประเภทแบตเตอรี่ | Sealed Lead-Acid, Maintenance-Free |
| จำนวนแบตเตอรี่ | 29 / 30 / 31 / 32 pcs, 12V Series |
| ขนาด | 975 × 554 × 1286 mm* |
| น้ำหนักสุทธิ | 400 kg |
| อุณหภูมิการทำงาน | 0–55°C |
| ความชื้นสัมพัทธ์ | <95%, Non-Condensing |
| ความสูงในการปฏิบัติการ | <1000m |
| การสื่อสาร | RS-232 / USB |
| SNMP | ไม่บังคับ |
ข้อมูลผลิตภัณฑ์และข้อมูลทางเทคนิค

การใช้งานทั่วไป
- Data centers and server facilities
- Industrial plants and manufacturing systems
- Power and utility infrastructure
- Telecom core facilities
- Hospitals and critical healthcare systems
- Transportation and tunnel infrastructure
- Commercial and public infrastructure
- Other high-capacity three-phase critical loads
How to Select an 80kVA Three-Phase UPS
Select the UPS according to the actual connected load in kW and kVA, input and output voltage, power factor, startup or peak demand, required backup time, battery configuration, bypass requirements, redundancy architecture, communication interfaces and installation environment.
For a 3/3 phase UPS, confirm that both the site electrical supply and protected critical loads require three-phase power.
Provide DAXIN ENERGY with the load list, single-line diagram, site voltage, required runtime, redundancy requirements, communication interfaces and installation conditions for project configuration.
การเลือกและวางแผนโครงการ
ก่อนสั่งซื้อ โปรดตรวจสอบให้แน่ใจว่าค่ากำลังไฟฟ้าที่ระบุไว้อย่างถูกต้อง, เฟสของไฟฟ้าเข้า/ออก, แรงดันไฟฟ้า, ความถี่, ค่าตัวประกอบกำลัง, แรงดันไฟฟ้าของแบตเตอรี่, เวลาทำงาน, ระบบบายพาส, ระบบสื่อสาร, ขนาด, ข้อจำกัดด้านสภาพแวดล้อม และวิธีการติดตั้ง ตรงกับรุ่นที่เลือกและแบบแปลนโครงการ.
คำถามที่มักถูกถาม
ผลิตภัณฑ์นี้สามารถปรับแต่งให้เหมาะสมกับโครงการเฉพาะได้หรือไม่?
ใช่ครับ การจัดระบบไฟฟ้า เวลาทำงานของแบตเตอรี่ ระบบการสื่อสาร ระบบบายพาส การจัดวางตู้ และอุปกรณ์เสริมของโครงการ สามารถตรวจสอบให้สอดคล้องกับข้อกำหนดของสถานที่ติดตั้งได้.
คะแนนทางเทคนิคทั้งหมดถูกใช้ร่วมกันในทั้งซีรีส์หรือไม่?
ไม่ครับ การจัดอันดับและฟังก์ชันอาจแตกต่างกันไปตามรุ่นและรูปแบบการตั้งค่า โปรดใช้เอกสารทางเทคนิคเฉพาะโครงการเป็นข้อมูลอ้างอิงสุดท้าย.
DAXIN ENERGY สามารถช่วยในการเลือกระบบได้หรือไม่?
ใช่ครับ โปรดให้ข้อมูลเกี่ยวกับรายการโหลด, เฟสและแรงดันไฟฟ้า, เวลาการทำงานที่ต้องการ, เป้าหมายความสำรอง, ข้อกำหนดด้านการสื่อสาร และสภาพแวดล้อมการติดตั้ง.
ขอข้อมูลการตั้งค่าโครงการ
ส่งข้อมูลโหลด แผนผังวงจรแบบเส้นเดียว เวลาสำรองที่จำเป็น และสภาพสถานที่ เพื่อรับข้อเสนอที่ปรับให้เหมาะสมกับความต้องการของคุณสำหรับ UPS หรือแบตเตอรี่.
What is the rated capacity of the DAXIN 3H3 80kVA?
The reference model is rated at 80kVA / 64kW.
What does 3/3 phase mean?
It means the UPS uses three-phase input and provides three-phase output.
What is the mains-to-battery transfer time?
The reference specification lists 0ms mains-to-battery transfer.
What output voltage does the UPS support?
The reference configuration supports 380/400/415VAC three-phase output.
How should an 80kVA UPS be sized?
UPS sizing should consider actual load in kW and kVA, power factor, peak demand, future expansion, required operating margin and backup-time requirements.
Can the 80kVA UPS support parallel redundancy?
Parallel and redundancy capabilities depend on the selected configuration and must be confirmed against the approved technical specification before system design.








รีวิว