Низкочастотный ИБП в режиме онлайн мощностью 120 кВА | DAXIN 3H3

The DAXIN 3H3 120kVA is a 120kVA/96kW low-frequency 3/3 phase online UPS designed for high-capacity critical power applications requiring three-phase input and three-phase output. Featuring online power protection, 0ms mains-to-battery transfer and project-configurable battery, bypass and monitoring options, it is suitable for data centers, industrial facilities, power infrastructure, transportation, healthcare and other large critical loads.

Получить расценки и техническую поддержку

Отправьте нам заявку с указанием количества и технических требований. Наша команда инженеров подготовит для вас подходящую конфигурацию.

Описание

What Is the DAXIN 3H3 120kVA 3/3 Phase Online UPS?

The DAXIN 3H3 120kVA is a 120kVA/96kW low-frequency online UPS designed for high-capacity critical applications requiring three-phase input and three-phase output power protection.

Its 3/3 phase architecture is intended for facilities where both the incoming electrical supply and protected critical loads operate on three-phase power.

The reference configuration supports 380/400/415VAC three-phase input and output, 0ms mains-to-battery transfer and greater than 90% efficiency.

Battery configuration, bypass, communications, redundancy requirements and other project parameters should be confirmed according to the connected load, required backup time and approved DAXIN technical proposal.

Основные преимущества

    • 120kVA / 96kW Capacity: Designed for high-capacity critical three-phase loads in industrial and infrastructure applications.
    • 3/3 Phase Architecture: Three-phase input and three-phase output support large three-phase electrical systems.
    • Low-Frequency UPS Design: Intended for demanding industrial and infrastructure critical-power applications.
    • Online Power Protection: Provides continuous conditioned power for sensitive and mission-critical loads.
    • 0ms Mains-to-Battery Transfer: Maintains output during utility-to-battery transition according to the reference specification.
    • Configurable Battery System: Battery configuration and runtime can be engineered according to load and backup-time requirements.
    • Monitoring and Protection: Display, alarm, protection and communication functions support system operation and maintenance.
    • Настройка на основе проектов: Parallel, redundancy, bypass and communication capabilities must be confirmed for the selected configuration.

What Does 3/3 Phase Mean in a UPS?

A 3/3 phase UPS uses three-phase AC power at the input and supplies three-phase AC power at the output.

This architecture is commonly used for high-capacity critical loads in data centers, industrial facilities, power infrastructure, healthcare systems and transportation applications.

The DAXIN 3H3 120kVA uses this three-phase input and three-phase output configuration for large critical-power applications.

DAXIN 3H3 120kVA Key Specifications

Параметр3H3-120kVA
Номинальная мощность120kVA / 96kW
ФазаThree-Phase Input / Three-Phase Output
Входное напряжение3×380 / 400 / 415VAC
Диапазон входного напряжения285–475VAC
Входная частота46–54Hz @ 50Hz; 56–64Hz @ 60Hz
Выходное напряжение380 / 400 / 415VAC
Battery-Mode Frequency50/60Hz ±0.1Hz
Коэффициент нелинейных искажений на выходе<3% Linear / <5% Non-linear
Mains-to-Battery Transfer0 мс
Эффективность>90%
Тип батареиSealed Lead-Acid, Maintenance-Free
Количество батарей29 / 30 / 31 / 32 pcs, 12V Series
Размеры975 × 554 × 1286 mm
Вес нетто573 kg
Рабочая температура0–55°C
Относительная влажность<95%, Non-Condensing
Рабочая высота<1000 м
КоммуникацияRS-232 / USB
SNMPOptional

Обзор продукции и техническая справка

DAXIN 3H3-60kVA 3/3 Phase Online UPS Technical Specifications
Technical specifications for the DAXIN 3H3-60kVA 3/3 phase online UPS.
Control Panel and Front Detail for DAXIN 3H3 120kVA Low-Frequency 3/3 Phase UPS.

Типичные области применения

  • Large data centers and server facilities
  • Industrial plants and manufacturing systems
  • Power and utility infrastructure
  • Telecom core facilities
  • Hospitals and critical healthcare systems
  • Transportation and tunnel infrastructure
  • Commercial and public infrastructure
  • Other high-capacity three-phase critical loads

How to Select a 120kVA Three-Phase UPS

Select the UPS according to the actual connected load in kW and kVA, input and output voltage, power factor, required backup time, battery configuration, bypass requirements, redundancy architecture, communication interfaces and installation environment.

For a 3/3 phase UPS, confirm that both the site electrical supply and protected critical loads require three-phase power.

Provide DAXIN ENERGY with the load list, single-line diagram, site voltage, required runtime, redundancy requirements, communications and installation conditions for project configuration.

Часто задаваемые вопросы

Можно ли настроить этот продукт под конкретный проект?

Да. Электрическую схему, время автономной работы от аккумулятора, средства связи, обходной контур, расположение шкафов и дополнительное оборудование для проекта можно согласовать с учетом требований объекта.

Все ли технические рейтинги одинаковы для всей серии?

Нет. Технические характеристики и функции зависят от модели и конфигурации. В качестве окончательного справочного материала используйте техническое описание, относящееся к конкретному проекту.

Может ли компания DAXIN ENERGY оказать поддержку в выборе системы?

Да. Предоставьте перечень нагрузок, фазы и напряжение, требуемое время автономной работы, целевые показатели резервирования, требования к связи и условия установки.

Запросить конфигурацию проекта

Отправьте данные о нагрузке, однолинейную схему, требуемое время автономной работы и условия эксплуатации, чтобы получить индивидуальное предложение по ИБП или аккумуляторной батарее.

What is the rated capacity of the DAXIN 3H3 120kVA?

The reference model is rated at 120kVA / 96kW.

What does 3/3 phase mean?

It means the UPS uses three-phase input and provides three-phase output.

What is the mains-to-battery transfer time?

The reference specification lists 0ms mains-to-battery transfer.

What output voltage does the UPS support?

The reference configuration supports 380/400/415VAC three-phase output.

Можно ли настроить время работы от аккумулятора?

Battery configuration and runtime should be selected according to connected load, required backup duration and the approved system configuration.

Does the 120kVA UPS support parallel redundancy?

Parallel and redundancy capabilities depend on the selected configuration and must be confirmed against the approved technical specification before system design.

Отзывы

Отзывов пока нет.

Будьте первым, кто оставил отзыв на «120kVA Low-Frequency Online UPS | DAXIN 3H3»

Ваш адрес email не будет опубликован. Обязательные поля помечены *