الوصف
What Is the DAXIN 3H3 120kVA 3/3 Phase Online UPS?
The DAXIN 3H3 120kVA is a 120kVA/96kW low-frequency online UPS designed for high-capacity critical applications requiring three-phase input and three-phase output power protection.
Its 3/3 phase architecture is intended for facilities where both the incoming electrical supply and protected critical loads operate on three-phase power.
The reference configuration supports 380/400/415VAC three-phase input and output, 0ms mains-to-battery transfer and greater than 90% efficiency.
Battery configuration, bypass, communications, redundancy requirements and other project parameters should be confirmed according to the connected load, required backup time and approved DAXIN technical proposal.
المزايا الرئيسية
- 120kVA / 96kW Capacity: Designed for high-capacity critical three-phase loads in industrial and infrastructure applications.
- 3/3 Phase Architecture: Three-phase input and three-phase output support large three-phase electrical systems.
- Low-Frequency UPS Design: Intended for demanding industrial and infrastructure critical-power applications.
- Online Power Protection: Provides continuous conditioned power for sensitive and mission-critical loads.
- 0ms Mains-to-Battery Transfer: Maintains output during utility-to-battery transition according to the reference specification.
- Configurable Battery System: Battery configuration and runtime can be engineered according to load and backup-time requirements.
- Monitoring and Protection: Display, alarm, protection and communication functions support system operation and maintenance.
- التكوين القائم على المشاريع: Parallel, redundancy, bypass and communication capabilities must be confirmed for the selected configuration.
What Does 3/3 Phase Mean in a UPS?
A 3/3 phase UPS uses three-phase AC power at the input and supplies three-phase AC power at the output.
This architecture is commonly used for high-capacity critical loads in data centers, industrial facilities, power infrastructure, healthcare systems and transportation applications.
The DAXIN 3H3 120kVA uses this three-phase input and three-phase output configuration for large critical-power applications.
DAXIN 3H3 120kVA Key Specifications
| المعلمة | 3H3-120kVA |
|---|---|
| السعة المقدرة | 120kVA / 96kW |
| المرحلة | مدخل ثلاثي الأطوار / مخرج ثلاثي الأطوار |
| جهد الدخل | 3×380 / 400 / 415VAC |
| نطاق جهد الدخل | 285–475VAC |
| تردد الإدخال | 46–54Hz @ 50Hz; 56–64Hz @ 60Hz |
| جهد الخرج | 380 / 400 / 415VAC |
| تردد وضع البطارية | 50/60Hz ±0.1Hz |
| التشويه التوافقي الكلي (THD) في الخرج | <3% Linear / <5% Non-linear |
| التحويل من التيار الكهربائي إلى البطارية | 0 مللي ثانية |
| الكفاءة | >90% |
| نوع البطارية | Sealed Lead-Acid, Maintenance-Free |
| عدد البطاريات | 29 / 30 / 31 / 32 pcs, 12V Series |
| الأبعاد | 975 × 554 × 1286 mm |
| الوزن الصافي | 573 kg |
| درجة حرارة التشغيل | 0–55°C |
| الرطوبة النسبية | <95%, Non-Condensing |
| ارتفاع التشغيل | <1000 متر |
| التواصل | RS-232 / USB |
| SNMP | اختياري |
معلومات عن المنتج والمراجع الفنية

التطبيقات النموذجية
- Large data centers and server facilities
- Industrial plants and manufacturing systems
- Power and utility infrastructure
- Telecom core facilities
- Hospitals and critical healthcare systems
- Transportation and tunnel infrastructure
- Commercial and public infrastructure
- Other high-capacity three-phase critical loads
How to Select a 120kVA Three-Phase UPS
Select the UPS according to the actual connected load in kW and kVA, input and output voltage, power factor, required backup time, battery configuration, bypass requirements, redundancy architecture, communication interfaces and installation environment.
For a 3/3 phase UPS, confirm that both the site electrical supply and protected critical loads require three-phase power.
Provide DAXIN ENERGY with the load list, single-line diagram, site voltage, required runtime, redundancy requirements, communications and installation conditions for project configuration.
الأسئلة الشائعة
هل يمكن تخصيص هذا المنتج لمشروع معين؟
نعم. يمكن مراجعة التكوين الكهربائي، ومدة تشغيل البطارية، وأنظمة الاتصالات، ونظام التجاوز، وترتيب الخزانات، وملحقات المشروع، وفقًا لمتطلبات الموقع.
هل يتم تطبيق جميع التصنيفات الفنية على السلسلة بأكملها؟
لا. تختلف القيم التصنيفية والوظائف باختلاف الطراز والتكوين. يرجى الاعتماد على ورقة المواصفات الفنية الخاصة بالمشروع كمرجع نهائي.
هل يمكن لشركة «داكسين إنيرجي» تقديم الدعم في اختيار النظام؟
نعم. يرجى تقديم قائمة الأحمال، وبيانات الطور والجهد الكهربائي، ومدة التشغيل المطلوبة، والهدف المحدد للتكرار، ومتطلبات الاتصال، وبيئة التركيب.
طلب تكوين مشروع
يرجى إرسال بيانات الحمل، والرسم التخطيطي أحادي الخط، ووقت النسخ الاحتياطي المطلوب، وظروف الموقع للحصول على عرض مخصص لجهاز UPS أو البطاريات.
What is the rated capacity of the DAXIN 3H3 120kVA?
The reference model is rated at 120kVA / 96kW.
What does 3/3 phase mean?
It means the UPS uses three-phase input and provides three-phase output.
What is the mains-to-battery transfer time?
The reference specification lists 0ms mains-to-battery transfer.
What output voltage does the UPS support?
The reference configuration supports 380/400/415VAC three-phase output.
هل يمكن تخصيص مدة تشغيل البطارية؟
Battery configuration and runtime should be selected according to connected load, required backup duration and the approved system configuration.
Does the 120kVA UPS support parallel redundancy?
Parallel and redundancy capabilities depend on the selected configuration and must be confirmed against the approved technical specification before system design.









المراجعات
لا توجد مراجعات بعد.