The DAXIN HR33 10KL is a high-frequency online UPS with flexible rack or tower installation for critical power applications. Featuring online double-conversion topology, digital control, LCD monitoring and configurable battery and communication options, it is designed for data centers, server rooms, telecom infrastructure, professional electronics and other critical loads. Final electrical ratings and optional functions are subject to the approved HR33 10KL technical configuration.

احصل على عرض أسعار ودعم فني

يرجى إرسال طلبك، والكمية المطلوبة، والمتطلبات الفنية. وسيقوم فريقنا الهندسي بالرد عليك بتقديم تكوين مناسب.

الوصف

What Is the DAXIN HR33 10KL Rack/Tower Online UPS?

The DAXIN HR33 10KL is a high-frequency online UPS designed to provide conditioned backup power for critical electrical and electronic equipment while supporting flexible rack or tower installation.

Its rack/tower convertible architecture allows the UPS to adapt to different equipment-room layouts, including rack-based IT environments and floor-standing installations.

The HR33 10KL uses online double-conversion operation and supports digital control, LCD monitoring and project-configurable battery, communication, bypass and other system options according to the selected configuration.

Typical applications include data centers, server rooms, telecom facilities, network infrastructure, professional electronics and other critical loads requiring reliable online power protection.

المزايا الرئيسية

    • Rack/Tower Convertible Design: Supports flexible installation in rack-based equipment rooms or tower configurations.
    • Online Double-Conversion Operation: Provides conditioned output power for connected critical loads.
    • High-Frequency UPS Architecture: Designed for professional critical-power applications with flexible deployment requirements.
    • Digital Control and LCD Monitoring: Supports convenient UPS status monitoring and system operation.
    • Configurable Battery Runtime: Battery configuration can be selected according to connected load and required backup duration.
    • خيارات الاتصال: Monitoring and communication interfaces can be configured according to project requirements.
    • التكوين القائم على المشاريع: ECO, EPO, bypass, communications, parallel operation and other optional functions must be confirmed according to the selected configuration and approved technical specification.

What Is a Rack/Tower Convertible UPS?

A rack/tower convertible UPS is designed to support flexible installation in different equipment-room environments. Depending on the compatible mounting configuration, the UPS can be integrated into an equipment rack or deployed in a tower-style arrangement.

This flexibility is useful for server rooms, data centers, telecom facilities and professional IT environments where available space and equipment layouts may vary.

The DAXIN HR33 10KL applies this flexible installation concept to support different critical-power deployment requirements.

Why Use an Online Double-Conversion UPS?

An online double-conversion UPS continuously supplies connected loads through the inverter, providing conditioned output power for sensitive and critical equipment.

This architecture is commonly used in applications where power continuity and output quality are important, including servers, network equipment, telecom systems and other professional electronic loads.

The appropriate UPS capacity, battery runtime and system configuration should be selected according to the actual connected load and project requirements.

معلومات عن المنتج والمراجع الفنية

Product View for DAXIN HR33 10KL High-Frequency Rack/Tower Convertible UPS.

DAXIN HR33-10KL Online UPS Technical Specifications
Technical specifications for the DAXIN HR33-10KL online UPS.

التطبيقات النموذجية

  • مراكز البيانات وغرف الخوادم
  • Telecom and communication facilities
  • Network switches, servers and IT infrastructure
  • Industrial control and automation equipment
  • أنظمة الأمن والمراقبة
  • Professional electronic equipment
  • Critical rack-mounted equipment
  • Floor-mounted critical power applications

How to Select the Right 10kVA Rack/Tower UPS

Select the UPS according to the actual connected load in kW and kVA, input and output phase, operating voltage, required backup time, battery configuration, installation orientation, bypass requirements and communication interfaces.

For rack installations, confirm rack dimensions, available installation space, ventilation and service clearances. For tower installations, confirm floor space, airflow and maintenance access.

Provide DAXIN ENERGY with the load list, site voltage, required runtime, rack or tower installation requirements, communication interfaces and installation environment to determine the appropriate UPS and battery configuration.

الاختيار وتخطيط المشاريع

يرجى التأكد من القوة الكهربائية الدقيقة، وطور الدخل/الخرج، والجهد، والتردد، ومعامل القدرة، وجهد البطارية، ومدة التشغيل، ونظام التجاوز، ووسائل الاتصال، والأبعاد، والحدود البيئية، وطريقة التركيب، مقارنةً بالطراز المختار ورسومات المشروع قبل تقديم الطلب.

الأسئلة الشائعة

هل يمكن تخصيص هذا المنتج لمشروع معين؟

نعم. يمكن مراجعة التكوين الكهربائي، ومدة تشغيل البطارية، وأنظمة الاتصالات، ونظام التجاوز، وترتيب الخزانات، وملحقات المشروع، وفقًا لمتطلبات الموقع.

هل يتم تطبيق جميع التصنيفات الفنية على السلسلة بأكملها؟

لا. تختلف القيم التصنيفية والوظائف باختلاف الطراز والتكوين. يرجى الاعتماد على ورقة المواصفات الفنية الخاصة بالمشروع كمرجع نهائي.

هل يمكن لشركة «داكسين إنيرجي» تقديم الدعم في اختيار النظام؟

نعم. يرجى تقديم قائمة الأحمال، وبيانات الطور والجهد الكهربائي، ومدة التشغيل المطلوبة، والهدف المحدد للتكرار، ومتطلبات الاتصال، وبيئة التركيب.

طلب تكوين مشروع

يرجى إرسال بيانات الحمل، والرسم التخطيطي أحادي الخط، ووقت النسخ الاحتياطي المطلوب، وظروف الموقع للحصول على عرض مخصص لجهاز UPS أو البطاريات.

Can the HR33 10KL be installed in a rack or tower configuration?

The HR33 10KL is designed for flexible rack or tower installation according to the compatible mounting configuration and project requirements.

Is the HR33 10KL an online double-conversion UPS?

Yes. The product uses online double-conversion operation for conditioned critical-load power protection.

هل يمكن تخصيص مدة تشغيل البطارية؟

Battery runtime depends on connected load, battery configuration and required backup duration. Long-runtime configurations can be reviewed according to project requirements.

Does the HR33 10KL support remote monitoring?

Communication and remote-monitoring options should be selected according to the HR33 10KL configuration and confirmed in the approved technical specification.