DAXIN 3H3 800K-T Low-Frequency 3/3 Phase Online UPS
What Is the DAXIN 3H3 800K-T 3/3 Phase Online UPS?
The DAXIN 3H3 800K-T is a low-frequency online UPS designed for large critical-power applications requiring three-phase input and three-phase output power protection.
Its 3/3 phase architecture is intended for facilities where both the incoming electrical supply and protected critical loads operate on three-phase power.
The 3H3 800K-T is positioned for large industrial, data center, infrastructure and other mission-critical projects where UPS capacity, battery autonomy, bypass architecture, communications and redundancy requirements must be engineered according to the site.
Final electrical ratings, battery configuration, runtime, dimensions, weight, communication interfaces and optional functions are subject to the approved DAXIN technical specification and project proposal.
المزايا الرئيسية
- 3/3 Phase Architecture: Three-phase input and three-phase output support large three-phase critical-power systems.
- Low-Frequency UPS Design: Intended for demanding industrial, infrastructure and mission-critical power applications.
- Online Power Protection: Provides conditioned power protection for sensitive and critical electrical loads.
- Project-Engineered Battery Runtime: Battery configuration and backup duration can be engineered according to connected load and project requirements.
- Monitoring and Protection: Display, alarm, bypass, protection and communication functions support system operation and maintenance according to the selected configuration.
- Redundancy Planning: Parallel and redundancy architecture can be reviewed according to project requirements and the capabilities of the selected configuration.
- التكوين القائم على المشاريع: Final capacity, voltage, battery system, bypass, communications and installation requirements are confirmed before ordering.
What Does 3/3 Phase Mean in a UPS?
A 3/3 phase UPS uses three-phase AC power at the input and supplies three-phase AC power at the output.
This architecture is commonly used for large critical loads in industrial facilities, data centers, power infrastructure, healthcare systems, transportation facilities and other three-phase electrical environments.
The DAXIN 3H3 800K-T uses this three-phase input and three-phase output architecture for large critical-power applications.
What Should Be Considered When Selecting a Large-Capacity UPS?
Large-capacity UPS selection should consider more than the nominal UPS rating. The engineering process should evaluate the actual critical load in kW and kVA, power factor, peak demand, future expansion, input and output electrical architecture, required backup time and redundancy target.
The project should also review battery-system architecture, bypass requirements, upstream and downstream protection coordination, generator compatibility, communication interfaces, installation space, ventilation, maintenance access and environmental conditions.
DAXIN ENERGY can review the load list, single-line diagram and site requirements before confirming the final UPS and battery configuration.
معلومات عن المنتج والمراجع الفنية
التطبيقات النموذجية
- Large data centers and mission-critical IT facilities
- Industrial plants and manufacturing facilities
- Power generation and utility infrastructure
- Telecom core facilities
- Hospitals and large healthcare campuses
- Transportation, railway and tunnel infrastructure
- Commercial and public infrastructure
- Other large three-phase critical-power systems
How to Select a Large-Capacity 3/3 Phase UPS
Select the UPS according to the measured critical load in kW and kVA, power factor, peak demand, input and output voltage, required operating margin, future expansion, battery autonomy, bypass architecture, redundancy target, communication requirements and installation environment.
For a 3/3 phase UPS, confirm that both the facility electrical supply and protected critical loads require three-phase power.
Large-capacity UPS projects should also evaluate upstream protection, generator compatibility, battery-system architecture, maintenance access, ventilation, floor loading and system redundancy before final equipment selection.
Provide DAXIN ENERGY with the load list, single-line diagram and site requirements for project-specific UPS and battery configuration.
الاختيار وتخطيط المشاريع
يرجى التأكد من القوة الكهربائية الدقيقة، وطور الدخل/الخرج، والجهد، والتردد، ومعامل القدرة، وجهد البطارية، ومدة التشغيل، ونظام التجاوز، ووسائل الاتصال، والأبعاد، والحدود البيئية، وطريقة التركيب، مقارنةً بالطراز المختار ورسومات المشروع قبل تقديم الطلب.
الأسئلة الشائعة
هل يمكن تخصيص هذا المنتج لمشروع معين؟
نعم. يمكن مراجعة التكوين الكهربائي، ومدة تشغيل البطارية، وأنظمة الاتصالات، ونظام التجاوز، وترتيب الخزانات، وملحقات المشروع، وفقًا لمتطلبات الموقع.
هل يتم تطبيق جميع التصنيفات الفنية على السلسلة بأكملها؟
لا. تختلف القيم التصنيفية والوظائف باختلاف الطراز والتكوين. يرجى الاعتماد على ورقة المواصفات الفنية الخاصة بالمشروع كمرجع نهائي.
هل يمكن لشركة «داكسين إنيرجي» تقديم الدعم في اختيار النظام؟
نعم. يرجى تقديم قائمة الأحمال، وبيانات الطور والجهد الكهربائي، ومدة التشغيل المطلوبة، والهدف المحدد للتكرار، ومتطلبات الاتصال، وبيئة التركيب.
طلب تكوين مشروع
يرجى إرسال بيانات الحمل، والرسم التخطيطي أحادي الخط، ووقت النسخ الاحتياطي المطلوب، وظروف الموقع للحصول على عرض مخصص لجهاز UPS أو البطاريات.
What is the DAXIN 3H3 800K-T?
The DAXIN 3H3 800K-T is a low-frequency 3/3 phase online UPS designed for large critical-power applications.
What does 3/3 phase mean?
It means the UPS uses three-phase AC input and provides three-phase AC output.
What is the rated capacity of the 3H3 800K-T?
目前不要回答 800kVA。
The final rated capacity and active-power rating should be confirmed against the approved DAXIN 3H3 800K-T technical specification.
هل يمكن تخصيص مدة تشغيل البطارية؟
Yes. Battery autonomy can be engineered according to connected load, required backup duration and the approved battery-system configuration.
Can the 3H3 800K-T be configured for redundant operation?
Parallel and redundancy capabilities depend on the selected configuration and must be confirmed during project engineering.
What information is required for system selection?
Provide the critical load in kW and kVA, site voltage and frequency, single-line diagram, required runtime, redundancy target, bypass requirements, communications, installation environment and available space.