{"id":2980,"date":"2026-08-02T15:25:06","date_gmt":"2026-08-02T15:25:06","guid":{"rendered":"https:\/\/btrytech.com\/en\/?post_type=product&#038;p=2980"},"modified":"2026-08-16T15:51:52","modified_gmt":"2026-08-16T07:51:52","slug":"daxin-3h3-500k-t-lf33-ups","status":"publish","type":"product","link":"https:\/\/btrytech.com\/tr\/product\/daxin-3h3-500k-t-lf33-ups\/","title":{"rendered":"3H3 500K-T D\u00fc\u015f\u00fck Frekansl\u0131 \u00c7evrimi\u00e7i UPS | DAXIN"},"content":{"rendered":"<h2>What Is the DAXIN 3H3 500K-T 3\/3 Phase Online UPS?<\/h2>\n<p>The DAXIN 3H3 500K-T is a low-frequency online UPS designed for large critical-power applications requiring three-phase input and three-phase output power protection.<\/p>\n<p>3\/3 fazl\u0131 mimarisi, hem gelen elektrik beslemesi hem de korunan kritik y\u00fcklerin \u00fc\u00e7 fazl\u0131 g\u00fc\u00e7le \u00e7al\u0131\u015ft\u0131\u011f\u0131 tesisler i\u00e7in tasarlanm\u0131\u015ft\u0131r.<\/p>\n<p>The 3H3 500K-T is positioned for large industrial, data center, infrastructure and other mission-critical projects where UPS capacity, battery autonomy, bypass architecture, communications and redundancy requirements must be engineered according to the site.<\/p>\n<p>Final electrical ratings, battery configuration, runtime, dimensions, weight, communication interfaces and optional functions are subject to the approved DAXIN technical specification and project proposal.<\/p>\n<h2>Ba\u015fl\u0131ca Avantajlar<\/h2>\n<ul>\n<li><strong>3\/3 Fazl\u0131 Mimari:<\/strong>\u00a0Three-phase input and three-phase output support large three-phase critical-power systems.<\/li>\n<li><strong>D\u00fc\u015f\u00fck Frekansl\u0131 UPS Tasar\u0131m\u0131:<\/strong>\u00a0Intended for demanding industrial, infrastructure and mission-critical power applications.<\/li>\n<li><strong>\u00c7evrimi\u00e7i G\u00fc\u00e7 Korumas\u0131:<\/strong>\u00a0Provides conditioned power protection for sensitive and critical electrical loads.<\/li>\n<li><strong>Project-Engineered Battery Runtime:<\/strong>\u00a0Battery configuration and backup duration can be engineered according to connected load and project requirements.<\/li>\n<li><strong>\u0130zleme ve Koruma:<\/strong>\u00a0Display, alarm, bypass, protection and communication functions support system operation and maintenance according to the selected configuration.<\/li>\n<li><strong>Redundancy Planning:<\/strong>\u00a0Parallel and redundancy architecture can be reviewed according to project requirements and the capabilities of the selected configuration.<\/li>\n<li><strong>Proje Tabanl\u0131 Yap\u0131land\u0131rma:<\/strong>\u00a0Final capacity, voltage, battery system, bypass, communications and installation requirements are confirmed before ordering.<\/li>\n<\/ul>\n<h2>Bir UPS\u2019te \u201c3\/3 faz\u201d ne anlama gelir?<\/h2>\n<p>3\/3 fazl\u0131 bir UPS, giri\u015fte \u00fc\u00e7 fazl\u0131 alternatif ak\u0131m kullan\u0131r ve \u00e7\u0131k\u0131\u015fta \u00fc\u00e7 fazl\u0131 alternatif ak\u0131m sa\u011flar.<\/p>\n<p>This architecture is commonly used for large critical loads in industrial facilities, data centers, power infrastructure, healthcare systems, transportation facilities and other three-phase electrical environments.<\/p>\n<p>The DAXIN 3H3 500K-T uses this three-phase input and three-phase output architecture for large critical-power applications.<\/p>\n<h2>How Is a Large-Capacity UPS System Sized?<\/h2>\n<p>Large-capacity UPS sizing should begin with the measured critical load in both kW and kVA rather than selecting a UPS from the model designation alone.<\/p>\n<p>The engineering calculation should consider load power factor, peak demand, future expansion, required operating margin, battery autonomy, redundancy architecture and the operating characteristics of the connected equipment.<\/p>\n<p>For a DAXIN 3H3 500K-T project, provide the load list, single-line diagram, site voltage and frequency, required backup time, redundancy target and installation conditions before final system selection.<\/p>\n<h2>\u00dcr\u00fcn G\u00f6r\u00fcn\u00fcmleri ve Teknik Referans<\/h2>\n<figure class=\"wp-block-image size-full\"><figcaption>Enclosure and Connection Detail for DAXIN 3H3 500K-T Low-Frequency 3\/3 Phase UPS.<\/figcaption><\/figure>\n<h2>Tipik Uygulamalar<\/h2>\n<ul>\n<li>B\u00fcy\u00fck veri merkezleri ve g\u00f6rev a\u00e7\u0131s\u0131ndan kritik BT tesisleri<\/li>\n<li>Industrial plants and manufacturing facilities<\/li>\n<li>Elektrik \u00fcretimi ve kamu hizmetleri altyap\u0131s\u0131<\/li>\n<li>Telekom \u00e7ekirdek tesisleri<\/li>\n<li>Hospitals and large healthcare campuses<\/li>\n<li>Ula\u015f\u0131m, demiryolu ve t\u00fcnel altyap\u0131s\u0131<\/li>\n<li>Ticari ve kamu altyap\u0131s\u0131<\/li>\n<li>Other large three-phase critical-power systems<\/li>\n<\/ul>\n<h2>How to Select a Large-Capacity 3\/3 Phase UPS<\/h2>\n<p>UPS\u2019i, kW ve kVA cinsinden \u00f6l\u00e7\u00fclen kritik y\u00fck, g\u00fc\u00e7 fakt\u00f6r\u00fc, tepe talep, giri\u015f ve \u00e7\u0131k\u0131\u015f gerilimi, gerekli \u00e7al\u0131\u015fma marj\u0131, gelecekteki geni\u015fleme planlar\u0131, pil \u00f6mr\u00fc, baypas mimarisi, yedeklilik hedefi, ileti\u015fim gereksinimleri ve kurulum ortam\u0131na g\u00f6re se\u00e7in.<\/p>\n<p>3\/3 fazl\u0131 bir UPS i\u00e7in, hem tesisin elektrik beslemesinin hem de korunacak kritik y\u00fcklerin \u00fc\u00e7 fazl\u0131 g\u00fc\u00e7 gerektirdi\u011finden emin olun.<\/p>\n<p>B\u00fcy\u00fck kapasiteli UPS projelerinde, nihai ekipman se\u00e7imi yap\u0131lmadan \u00f6nce, sistemin \u00f6n ve son a\u015famalar\u0131ndaki koruma koordinasyonu, jenerat\u00f6r uyumlulu\u011fu, ak\u00fc sistemi mimarisi, bak\u0131m eri\u015fimi, havaland\u0131rma, zemin y\u00fck\u00fc ve sistem yedeklili\u011fi de de\u011ferlendirilmelidir.<\/p>\n<p>DAXIN ENERGY\u2019ye, projeye \u00f6zg\u00fc UPS ve ak\u00fc konfig\u00fcrasyonu i\u00e7in y\u00fck listesini, tek hat \u015femas\u0131n\u0131 ve saha gereksinimlerini sa\u011flay\u0131n.<\/p>\n<h2>S\u0131k Sorulan Sorular<\/h2>\n<h3>Bu \u00fcr\u00fcn belirli bir projeye g\u00f6re \u00f6zelle\u015ftirilebilir mi?<\/h3>\n<p>Evet. Elektrik konfig\u00fcrasyonu, pil \u00e7al\u0131\u015fma s\u00fcresi, ileti\u015fim, baypas, kabin d\u00fczeni ve proje aksesuarlar\u0131, tesisin gereksinimlerine g\u00f6re g\u00f6zden ge\u00e7irilebilir.<\/p>\n<h3>T\u00fcm teknik derecelendirmeler serinin tamam\u0131nda ortak m\u0131d\u0131r?<\/h3>\n<p>Hay\u0131r. Teknik \u00f6zellikler ve i\u015flevler modele ve yap\u0131land\u0131rmaya g\u00f6re de\u011fi\u015fiklik g\u00f6sterir. Nihai referans olarak projeye \u00f6zg\u00fc teknik veri sayfas\u0131n\u0131 kullan\u0131n.<\/p>\n<h3>DAXIN ENERGY, sistem se\u00e7iminde destek sa\u011flayabilir mi?<\/h3>\n<p>Evet. Y\u00fck listesini, faz ve gerilimi, gerekli \u00e7al\u0131\u015fma s\u00fcresini, yedeklilik hedefini, ileti\u015fim gereksinimlerini ve kurulum ortam\u0131n\u0131 belirtin.<\/p>\n<h2>Proje Yap\u0131land\u0131rmas\u0131 Talep Et<\/h2>\n<p>\u00d6zel olarak haz\u0131rlanm\u0131\u015f bir UPS veya ak\u00fc teklifi almak i\u00e7in y\u00fck verilerini, tek hat \u015femas\u0131n\u0131, gerekli yedekleme s\u00fcresini ve saha ko\u015fullar\u0131n\u0131 bize g\u00f6nderin.<\/p>\n<h3 class=\"PDq2pG_selectionAnchorContainer\" data-section-id=\"16593ut\" data-start=\"9345\" data-end=\"9378\">What is the DAXIN 3H3 500K-T?<\/h3>\n<blockquote data-start=\"9380\" data-end=\"9490\">\n<p data-start=\"9382\" data-end=\"9490\">The DAXIN 3H3 500K-T is a low-frequency 3\/3 phase online UPS designed for large critical-power applications.<\/p>\n<\/blockquote>\n<h3 data-section-id=\"1qek9s9\" data-start=\"9492\" data-end=\"9521\">3\/3 faz ne anlama gelir?<\/h3>\n<blockquote data-start=\"9523\" data-end=\"9603\">\n<p data-start=\"9525\" data-end=\"9603\">It means the UPS uses three-phase AC input and provides three-phase AC output.<\/p>\n<\/blockquote>\n<h3 data-section-id=\"112s865\" data-start=\"9605\" data-end=\"9654\">What is the rated capacity of the 3H3 500K-T?<\/h3>\n<blockquote data-start=\"9663\" data-end=\"9796\">\n<p data-start=\"9665\" data-end=\"9796\">The final rated capacity and active-power rating should be confirmed against the approved DAXIN 3H3 500K-T technical specification.<\/p>\n<\/blockquote>\n<h3 data-section-id=\"9fb4w2\" data-start=\"9798\" data-end=\"9836\">Can battery runtime be customized?<\/h3>\n<blockquote data-start=\"9838\" data-end=\"9980\">\n<p data-start=\"9840\" data-end=\"9980\">Yes. Battery autonomy can be engineered according to connected load, required backup duration and the approved battery-system configuration.<\/p>\n<\/blockquote>\n<h3 data-section-id=\"1il2cpd\" data-start=\"9982\" data-end=\"10043\">Can the 3H3 500K-T be configured for redundant operation?<\/h3>\n<blockquote data-start=\"10045\" data-end=\"10170\">\n<p data-start=\"10047\" data-end=\"10170\">Parallel and redundancy capabilities depend on the selected configuration and must be confirmed during project engineering.<\/p>\n<\/blockquote>\n<h3 data-section-id=\"1b5yguq\" data-start=\"10172\" data-end=\"10226\">What information is required for system selection?<\/h3>\n<blockquote data-start=\"10228\" data-end=\"10439\">\n<p data-start=\"10230\" data-end=\"10439\">Provide the critical load in kW and kVA, site voltage and frequency, single-line diagram, required runtime, redundancy target, bypass requirements, communications, installation environment and available space.<\/p>\n<\/blockquote>","protected":false},"excerpt":{"rendered":"<p>The DAXIN 3H3 500K-T is a low-frequency 3\/3 phase online UPS designed for large critical-power applications requiring three-phase input and three-phase output. Its project-oriented configuration supports industrial facilities, data centers, power infrastructure, transportation, healthcare and other mission-critical environments. Battery runtime, bypass, communications, redundancy and final electrical parameters are confirmed according to the approved project configuration.<\/p>","protected":false},"featured_media":4924,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[622,46],"product_cat":[109,99,97],"product_tag":[],"class_list":["post-2980","product","type-product","status-publish","has-post-thumbnail","product_brand-daxin-energy","product_brand-szdxzh","product_cat-low-frequency-3-3-phase-ups","product_cat-low-frequency-ups","product_cat-ups-solutions","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product\/2980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/comments?post=2980"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/media\/4924"}],"wp:attachment":[{"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/media?parent=2980"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product_brand?post=2980"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product_cat?post=2980"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product_tag?post=2980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}