{"id":2960,"date":"2026-08-02T15:23:02","date_gmt":"2026-08-02T15:23:02","guid":{"rendered":"https:\/\/btrytech.com\/en\/?post_type=product&#038;p=2960"},"modified":"2026-08-15T21:42:09","modified_gmt":"2026-08-15T13:42:09","slug":"daxin-3h3-80kva-lf33-ups","status":"publish","type":"product","link":"https:\/\/btrytech.com\/tr\/product\/daxin-3h3-80kva-lf33-ups\/","title":{"rendered":"80 kVA D\u00fc\u015f\u00fck Frekansl\u0131 \u00c7evrimi\u00e7i UPS | DAXIN 3H3"},"content":{"rendered":"<h2>What Is the DAXIN 3H3 80kVA 3\/3 Phase Online UPS?<\/h2>\n<p>The DAXIN 3H3 80kVA is an 80kVA\/64kW low-frequency online UPS designed for critical applications requiring three-phase input and three-phase output power protection.<\/p>\n<p>3\/3 fazl\u0131 mimarisi, hem gelen elektrik beslemesi hem de korunan kritik y\u00fcklerin \u00fc\u00e7 fazl\u0131 g\u00fc\u00e7le \u00e7al\u0131\u015ft\u0131\u011f\u0131 tesisler i\u00e7in tasarlanm\u0131\u015ft\u0131r.<\/p>\n<p>Referans konfig\u00fcrasyon, 380\/400\/415 VAC \u00fc\u00e7 fazl\u0131 giri\u015f ve \u00e7\u0131k\u0131\u015f\u0131, 0 ms \u015febeke-ak\u00fc ge\u00e7i\u015f s\u00fcresini ve 90%\u2019den y\u00fcksek verimlili\u011fi desteklemektedir.<\/p>\n<p>Pil konfig\u00fcrasyonu, baypas, ileti\u015fim, yedeklilik gereksinimleri ve di\u011fer proje parametreleri, ba\u011fl\u0131 y\u00fck, gerekli yedekleme s\u00fcresi ve onaylanm\u0131\u015f DAXIN teknik teklifine g\u00f6re teyit edilmelidir.<\/p>\n<h2>Ba\u015fl\u0131ca Avantajlar<\/h2>\n<ul>\n<li><strong>80kVA \/ 64kW Capacity:<\/strong>\u00a0Designed for high-capacity critical three-phase loads in industrial and infrastructure applications.<\/li>\n<li><strong>3\/3 Fazl\u0131 Mimari:<\/strong>\u00a0Three-phase input and three-phase output support large three-phase electrical systems.<\/li>\n<li><strong>D\u00fc\u015f\u00fck Frekansl\u0131 UPS Tasar\u0131m\u0131:<\/strong>\u00a0Intended for demanding industrial and infrastructure critical-power applications.<\/li>\n<li><strong>\u00c7evrimi\u00e7i G\u00fc\u00e7 Korumas\u0131:<\/strong>\u00a0Hassas ve g\u00f6rev a\u00e7\u0131s\u0131ndan kritik y\u00fckler i\u00e7in stabilize edilmi\u015f g\u00fc\u00e7 sa\u011flar.<\/li>\n<li><strong>0 ms \u015eebeke-Pil Ge\u00e7i\u015fi:<\/strong>\u00a0Referans teknik \u015fartnamesine g\u00f6re, \u015febeke-pil ge\u00e7i\u015fi s\u0131ras\u0131nda g\u00fc\u00e7 \u00e7\u0131k\u0131\u015f\u0131n\u0131 korur.<\/li>\n<li><strong>Yap\u0131land\u0131r\u0131labilir Pil Sistemi:<\/strong>\u00a0Battery configuration and runtime can be engineered according to load and backup-time requirements.<\/li>\n<li><strong>\u0130zleme ve Koruma:<\/strong>\u00a0Ekran, alarm, koruma ve ileti\u015fim i\u015flevleri, sistemin \u00e7al\u0131\u015ft\u0131r\u0131lmas\u0131 ve bak\u0131m\u0131n\u0131 destekler.<\/li>\n<li><strong>Proje Tabanl\u0131 Yap\u0131land\u0131rma:<\/strong>\u00a0Se\u00e7ilen yap\u0131land\u0131rma i\u00e7in paralel, yedeklilik, baypas ve ileti\u015fim \u00f6zelliklerinin do\u011frulanmas\u0131 gerekir.<\/li>\n<\/ul>\n<h2>Bir UPS\u2019te \u201c3\/3 faz\u201d ne anlama gelir?<\/h2>\n<p>3\/3 fazl\u0131 bir UPS, giri\u015fte \u00fc\u00e7 fazl\u0131 alternatif ak\u0131m kullan\u0131r ve \u00e7\u0131k\u0131\u015fta \u00fc\u00e7 fazl\u0131 alternatif ak\u0131m sa\u011flar.<\/p>\n<p>This configuration is commonly used for medium- and high-capacity critical loads in data centers, industrial facilities, telecom infrastructure, healthcare systems and other facilities operating three-phase electrical equipment.<\/p>\n<p>The DAXIN 3H3 80kVA uses this three-phase input and three-phase output architecture for critical-power applications requiring 80kVA-class UPS capacity.<\/p>\n<h2>What Loads Can an 80kVA UPS Support?<\/h2>\n<p>The DAXIN 3H3 80kVA reference model is rated at 80kVA \/ 64kW. The actual equipment that can be supported depends on the combined active power, power factor, startup or peak demand and required operating margin of the connected loads.<\/p>\n<p>UPS sizing should be based on measured or calculated load data rather than equipment quantity alone. Future expansion and required battery runtime should also be considered during system design.<\/p>\n<h2>\nKey Specifications<br \/>\nDAXIN 3H3 80kVA Key Specifications<\/h2>\n<table>\n<thead>\n<tr>\n<th>Parametre<\/th>\n<th>3H3-80kVA<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Nominal Kapasite<\/strong><\/td>\n<td><strong>80kVA \/ 64kW<\/strong><\/td>\n<\/tr>\n<tr>\n<td>A\u015fama<\/td>\n<td>\u00dc\u00e7 Fazl\u0131 Giri\u015f \/ \u00dc\u00e7 Fazl\u0131 \u00c7\u0131k\u0131\u015f<\/td>\n<\/tr>\n<tr>\n<td>Giri\u015f Gerilimi<\/td>\n<td>3\u00d7380 \/ 400 \/ 415VAC<\/td>\n<\/tr>\n<tr>\n<td>Input Voltage Range<\/td>\n<td>285\u2013475VAC<\/td>\n<\/tr>\n<tr>\n<td>Giri\u015f Frekans\u0131<\/td>\n<td>46\u201354Hz @ 50Hz; 56\u201364Hz @ 60Hz<\/td>\n<\/tr>\n<tr>\n<td>\u00c7\u0131k\u0131\u015f Gerilimi<\/td>\n<td>380 \/ 400 \/ 415VAC<\/td>\n<\/tr>\n<tr>\n<td>Battery-Mode Frequency<\/td>\n<td>50\/60Hz \u00b10.1Hz<\/td>\n<\/tr>\n<tr>\n<td>\u00c7\u0131k\u0131\u015f THD'si<\/td>\n<td>&lt;3% Linear \/ &lt;5% Non-linear<\/td>\n<\/tr>\n<tr>\n<td>Mains-to-Battery Transfer<\/td>\n<td>0 ms<\/td>\n<\/tr>\n<tr>\n<td>Verimlilik<\/td>\n<td>&gt;90%<\/td>\n<\/tr>\n<tr>\n<td>Pil T\u00fcr\u00fc<\/td>\n<td>Sealed Lead-Acid, Maintenance-Free<\/td>\n<\/tr>\n<tr>\n<td>Pil Adedi<\/td>\n<td>29 \/ 30 \/ 31 \/ 32 pcs, 12V Series<\/td>\n<\/tr>\n<tr>\n<td>Boyutlar<\/td>\n<td><strong>975 \u00d7 554 \u00d7 1286 mm<\/strong>*<\/td>\n<\/tr>\n<tr>\n<td>Net A\u011f\u0131rl\u0131k<\/td>\n<td><strong>400 kg<\/strong><\/td>\n<\/tr>\n<tr>\n<td>\u00c7al\u0131\u015fma S\u0131cakl\u0131\u011f\u0131<\/td>\n<td>0\u201355\u00b0C<\/td>\n<\/tr>\n<tr>\n<td>Ba\u011f\u0131l Nem<\/td>\n<td>&lt;95%, Non-Condensing<\/td>\n<\/tr>\n<tr>\n<td>\u00c7al\u0131\u015fma \u0130rtifas\u0131<\/td>\n<td>&lt;1000m<\/td>\n<\/tr>\n<tr>\n<td>\u0130leti\u015fim<\/td>\n<td>RS-232 \/ USB<\/td>\n<\/tr>\n<tr>\n<td>SNMP<\/td>\n<td>Optional<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>\n\u00dcr\u00fcn G\u00f6r\u00fcn\u00fcmleri ve Teknik Referans<\/h2>\n<figure class=\"wp-block-image size-full\">\n<p><figure id=\"attachment_4909\" aria-describedby=\"caption-attachment-4909\" style=\"width: 970px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4909\" src=\"https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS.webp\" alt=\"DAXIN 3H3-60kVA 3\/3 Fazl\u0131 \u00c7evrimi\u00e7i UPS Teknik \u00d6zellikleri\" width=\"970\" height=\"914\" srcset=\"https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS.webp 970w, https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS-300x283.webp 300w, https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS-768x724.webp 768w, https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS-13x12.webp 13w\" sizes=\"auto, (max-width: 970px) 100vw, 970px\" \/><figcaption id=\"caption-attachment-4909\" class=\"wp-caption-text\">Technical specifications for the DAXIN 3H3-60kVA 3\/3 phase online UPS.<\/figcaption><\/figure><\/figure>\n<figure class=\"wp-block-image size-full\"><figcaption>Control Panel and Front Detail for DAXIN 3H3 80kVA Low-Frequency 3\/3 Phase UPS.<\/figcaption><\/figure>\n<h2>Tipik Uygulamalar<\/h2>\n<ul>\n<li>Data centers and server facilities<\/li>\n<li>Industrial plants and manufacturing systems<\/li>\n<li>Power and utility infrastructure<\/li>\n<li>Telekom \u00e7ekirdek tesisleri<\/li>\n<li>Hospitals and critical healthcare systems<\/li>\n<li>Transportation and tunnel infrastructure<\/li>\n<li>Ticari ve kamu altyap\u0131s\u0131<\/li>\n<li>Other high-capacity three-phase critical loads<\/li>\n<\/ul>\n<h2>How to Select an 80kVA Three-Phase UPS<\/h2>\n<p>UPS\u2019i, kW ve kVA cinsinden ger\u00e7ek ba\u011fl\u0131 y\u00fck, giri\u015f ve \u00e7\u0131k\u0131\u015f gerilimi, g\u00fc\u00e7 fakt\u00f6r\u00fc, ba\u015flang\u0131\u00e7 veya tepe y\u00fck talebi, gerekli yedekleme s\u00fcresi, ak\u00fc konfig\u00fcrasyonu, baypas gereksinimleri, yedeklilik mimarisi, ileti\u015fim aray\u00fczleri ve kurulum ortam\u0131na g\u00f6re se\u00e7in.<\/p>\n<p>3\/3 fazl\u0131 bir UPS i\u00e7in, hem tesisin elektrik beslemesinin hem de korunacak kritik y\u00fcklerin \u00fc\u00e7 fazl\u0131 g\u00fc\u00e7 gerektirdi\u011finden emin olun.<\/p>\n<p>Proje yap\u0131land\u0131rmas\u0131 i\u00e7in DAXIN ENERGY\u2019ye y\u00fck listesini, tek hat \u015femas\u0131n\u0131, tesis gerilimini, gerekli \u00e7al\u0131\u015fma s\u00fcresini, yedeklilik gereksinimlerini, ileti\u015fim aray\u00fczlerini ve kurulum ko\u015fullar\u0131n\u0131 sa\u011flay\u0131n.<\/p>\n<h2>\nSe\u00e7im ve Proje Planlamas\u0131<\/h2>\n<p>Sipari\u015f vermeden \u00f6nce, se\u00e7ilen modele ve proje \u00e7izimlerine g\u00f6re tam g\u00fc\u00e7 de\u011ferini, giri\u015f\/\u00e7\u0131k\u0131\u015f faz\u0131n\u0131, gerilimi, frekans\u0131, g\u00fc\u00e7 fakt\u00f6r\u00fcn\u00fc, ak\u00fc gerilimini, \u00e7al\u0131\u015fma s\u00fcresini, baypas \u00f6zelli\u011fini, ileti\u015fim \u00f6zelliklerini, boyutlar\u0131, \u00e7evresel s\u0131n\u0131rlar\u0131 ve kurulum y\u00f6ntemini teyit ediniz.<\/p>\n<h2>S\u0131k Sorulan Sorular<\/h2>\n<h3>Bu \u00fcr\u00fcn belirli bir projeye g\u00f6re \u00f6zelle\u015ftirilebilir mi?<\/h3>\n<p>Evet. Elektrik konfig\u00fcrasyonu, pil \u00e7al\u0131\u015fma s\u00fcresi, ileti\u015fim, baypas, kabin d\u00fczeni ve proje aksesuarlar\u0131, tesisin gereksinimlerine g\u00f6re g\u00f6zden ge\u00e7irilebilir.<\/p>\n<h3>T\u00fcm teknik derecelendirmeler serinin tamam\u0131nda ortak m\u0131d\u0131r?<\/h3>\n<p>Hay\u0131r. Teknik \u00f6zellikler ve i\u015flevler modele ve yap\u0131land\u0131rmaya g\u00f6re de\u011fi\u015fiklik g\u00f6sterir. Nihai referans olarak projeye \u00f6zg\u00fc teknik veri sayfas\u0131n\u0131 kullan\u0131n.<\/p>\n<h3>DAXIN ENERGY, sistem se\u00e7iminde destek sa\u011flayabilir mi?<\/h3>\n<p>Evet. Y\u00fck listesini, faz ve gerilimi, gerekli \u00e7al\u0131\u015fma s\u00fcresini, yedeklilik hedefini, ileti\u015fim gereksinimlerini ve kurulum ortam\u0131n\u0131 belirtin.<\/p>\n<h2>Proje Yap\u0131land\u0131rmas\u0131 Talep Et<\/h2>\n<p>\u00d6zel olarak haz\u0131rlanm\u0131\u015f bir UPS veya ak\u00fc teklifi almak i\u00e7in y\u00fck verilerini, tek hat \u015femas\u0131n\u0131, gerekli yedekleme s\u00fcresini ve saha ko\u015fullar\u0131n\u0131 bize g\u00f6nderin.<\/p>\n<h3 class=\"PDq2pG_selectionAnchorContainer\" data-section-id=\"4zmkr8\" data-start=\"8543\" data-end=\"8597\">What is the rated capacity of the DAXIN 3H3 80kVA?<\/h3>\n<p data-start=\"8599\" data-end=\"8648\">The reference model is rated at 80kVA \/ 64kW.<\/p>\n<h3 data-section-id=\"1qek9s9\" data-start=\"8650\" data-end=\"8679\">3\/3 faz ne anlama gelir?<\/h3>\n<p data-start=\"8681\" data-end=\"8757\">Bu, UPS\u2019in \u00fc\u00e7 fazl\u0131 giri\u015f kulland\u0131\u011f\u0131 ve \u00fc\u00e7 fazl\u0131 \u00e7\u0131k\u0131\u015f sa\u011flad\u0131\u011f\u0131 anlam\u0131na gelir.<\/p>\n<h3 data-section-id=\"1gp3azk\" data-start=\"8759\" data-end=\"8806\">\u015eebeke ak\u0131m\u0131ndan ak\u00fcye ge\u00e7i\u015f s\u00fcresi ne kadard\u0131r?<\/h3>\n<p data-start=\"8808\" data-end=\"8876\">Referans teknik \u00f6zelliklerinde, \u015febekeden ak\u00fcye ge\u00e7i\u015f s\u00fcresinin 0 ms oldu\u011fu belirtilmi\u015ftir.<\/p>\n<h3 data-section-id=\"1b2caab\" data-start=\"8878\" data-end=\"8923\">UPS hangi \u00e7\u0131k\u0131\u015f gerilimini destekliyor?<\/h3>\n<p data-start=\"8925\" data-end=\"9000\">Referans konfig\u00fcrasyon, 380\/400\/415 VAC \u00fc\u00e7 fazl\u0131 \u00e7\u0131k\u0131\u015f\u0131 desteklemektedir.<\/p>\n<h3 data-section-id=\"1f4wgjv\" data-start=\"9002\" data-end=\"9039\">How should an 80kVA UPS be sized?<\/h3>\n<p data-start=\"9041\" data-end=\"9199\">UPS sizing should consider actual load in kW and kVA, power factor, peak demand, future expansion, required operating margin and backup-time requirements.<\/p>\n<h3 data-section-id=\"11nrlqr\" data-start=\"9201\" data-end=\"9251\">Can the 80kVA UPS support parallel redundancy?<\/h3>\n<p data-start=\"9253\" data-end=\"9419\">Parallel and redundancy capabilities depend on the selected configuration and must be confirmed against the approved technical specification before system design.<\/p>","protected":false},"excerpt":{"rendered":"<p>The DAXIN 3H3 80kVA is an 80kVA\/64kW low-frequency 3\/3 phase online UPS designed for high-capacity critical power applications requiring three-phase input and three-phase output. Featuring online power protection, 0ms mains-to-battery transfer and project-configurable battery, bypass and monitoring options, it is suitable for data centers, industrial facilities, power infrastructure, transportation, healthcare and other critical three-phase loads.<\/p>","protected":false},"featured_media":4908,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[622,46],"product_cat":[109,99,97],"product_tag":[],"class_list":["post-2960","product","type-product","status-publish","has-post-thumbnail","product_brand-daxin-energy","product_brand-szdxzh","product_cat-low-frequency-3-3-phase-ups","product_cat-low-frequency-ups","product_cat-ups-solutions","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product\/2960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/comments?post=2960"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/media\/4908"}],"wp:attachment":[{"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/media?parent=2960"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product_brand?post=2960"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product_cat?post=2960"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/btrytech.com\/tr\/wp-json\/wp\/v2\/product_tag?post=2960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}