{"id":2950,"date":"2026-08-02T15:22:00","date_gmt":"2026-08-02T15:22:00","guid":{"rendered":"https:\/\/btrytech.com\/en\/?post_type=product&#038;p=2950"},"modified":"2026-08-15T22:40:23","modified_gmt":"2026-08-15T14:40:23","slug":"daxin-3h3-40kva-lf33-ups","status":"publish","type":"product","link":"https:\/\/btrytech.com\/ar\/product\/daxin-3h3-40kva-lf33-ups\/","title":{"rendered":"40kVA Low-Frequency Online UPS | DAXIN 3H3"},"content":{"rendered":"<h2>What Is the DAXIN 3H3 40kVA 3\/3 Phase Online UPS?<\/h2>\n<p>The DAXIN 3H3 40kVA is a 40kVA\/32kW low-frequency online UPS designed for critical applications requiring three-phase input and three-phase output power protection.<\/p>\n<p>Its 3\/3 phase architecture is intended for facilities where both the incoming electrical supply and protected critical loads operate on three-phase power.<\/p>\n<p>The reference configuration supports 380\/400\/415VAC three-phase input and output, 0ms mains-to-battery transfer and greater than 90% efficiency.<\/p>\n<p>Battery configuration, bypass, communications, redundancy requirements and other project parameters should be confirmed according to the connected load, required backup time and approved DAXIN technical proposal.<\/p>\n<h2>\u0627\u0644\u0645\u0632\u0627\u064a\u0627 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629<\/h2>\n<ul>\n<li><strong>40kVA \/ 32kW Capacity:<\/strong>\u00a0Designed for medium-capacity critical three-phase loads in industrial and infrastructure applications.<\/li>\n<li><strong>3\/3 Phase Architecture:<\/strong>\u00a0Three-phase input and three-phase output support critical three-phase electrical systems.<\/li>\n<li><strong>Low-Frequency UPS Design:<\/strong>\u00a0Intended for demanding industrial and infrastructure power-protection applications.<\/li>\n<li><strong>Online Power Protection:<\/strong>\u00a0Provides conditioned power for sensitive and mission-critical loads.<\/li>\n<li><strong>0ms Mains-to-Battery Transfer:<\/strong>\u00a0Maintains output during utility-to-battery transition according to the reference specification.<\/li>\n<li><strong>Configurable Battery System:<\/strong>\u00a0Battery configuration and runtime can be engineered according to connected load and required backup duration.<\/li>\n<li><strong>Monitoring and Protection:<\/strong>\u00a0Display, alarm, protection and communication functions support system operation and maintenance.<\/li>\n<li><strong>\u0627\u0644\u062a\u0643\u0648\u064a\u0646 \u0627\u0644\u0642\u0627\u0626\u0645 \u0639\u0644\u0649 \u0627\u0644\u0645\u0634\u0627\u0631\u064a\u0639:<\/strong>\u00a0Parallel, redundancy, bypass and communication capabilities must be confirmed for the selected configuration.<\/li>\n<\/ul>\n<h2>What Does 3\/3 Phase Mean in a UPS?<\/h2>\n<p>A 3\/3 phase UPS uses three-phase AC power at the input and supplies three-phase AC power at the output.<\/p>\n<p>This configuration is commonly used for critical three-phase loads in industrial facilities, data centers, telecom infrastructure, healthcare systems and transportation applications.<\/p>\n<p>The DAXIN 3H3 40kVA uses this three-phase input and three-phase output architecture for applications requiring reliable 40kVA-class power protection.<\/p>\n<h2>When Should You Choose a 40kVA UPS?<\/h2>\n<p>A 40kVA UPS may be appropriate when the calculated critical load, operating margin and expected future expansion require capacity above smaller three-phase UPS systems but do not justify a larger 60kVA or 80kVA configuration.<\/p>\n<p>The DAXIN 3H3 40kVA reference model is rated at 40kVA \/ 32kW. Final selection should be based on actual load in kW and kVA, power factor, startup demand, required battery runtime and future capacity requirements.<\/p>\n<h2>\n\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0639\u0646 \u0627\u0644\u0645\u0646\u062a\u062c \u0648\u0627\u0644\u0645\u0631\u0627\u062c\u0639 \u0627\u0644\u0641\u0646\u064a\u0629<\/h2>\n<figure class=\"wp-block-image size-full\">\n<p><figure id=\"attachment_4909\" aria-describedby=\"caption-attachment-4909\" style=\"width: 970px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4909\" src=\"https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS.webp\" alt=\"DAXIN 3H3-60kVA 3\/3 Phase Online UPS Technical Specifications\" width=\"970\" height=\"914\" srcset=\"https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS.webp 970w, https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS-300x283.webp 300w, https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS-768x724.webp 768w, https:\/\/btrytech.com\/wp-content\/uploads\/2026\/08\/3H3-60kVA-CS-13x12.webp 13w\" sizes=\"auto, (max-width: 970px) 100vw, 970px\" \/><figcaption id=\"caption-attachment-4909\" class=\"wp-caption-text\">Technical specifications for the DAXIN 3H3-60kVA 3\/3 phase online UPS.<\/figcaption><\/figure><\/figure>\n<figure class=\"wp-block-image size-full\"><figcaption>Product Close-Up for DAXIN 3H3 40kVA Low-Frequency 3\/3 Phase UPS.<\/figcaption><\/figure>\n<h2>\u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0627\u0644\u0646\u0645\u0648\u0630\u062c\u064a\u0629<\/h2>\n<ul>\n<li>Industrial plants and automation systems<\/li>\n<li>\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0648\u0645\u0646\u0634\u0622\u062a \u0627\u0644\u062e\u0648\u0627\u062f\u0645<\/li>\n<li>\u0627\u0644\u0628\u0646\u064a\u0629 \u0627\u0644\u062a\u062d\u062a\u064a\u0629 \u0644\u0644\u0627\u062a\u0635\u0627\u0644\u0627\u062a \u0627\u0644\u0633\u0644\u0643\u064a\u0629 \u0648\u0627\u0644\u0644\u0627\u0633\u0644\u0643\u064a\u0629<\/li>\n<li>Power and utility systems<\/li>\n<li>Hospitals and healthcare equipment<\/li>\n<li>Transportation and tunnel infrastructure<\/li>\n<li>Commercial and public facilities<\/li>\n<li>Other three-phase critical electrical loads<\/li>\n<\/ul>\n<h2>How to Select a 40kVA Three-Phase UPS<\/h2>\n<p>Select the UPS according to the actual connected load in kW and kVA, input and output voltage, power factor, startup or peak demand, required backup time, battery configuration, bypass requirements, redundancy architecture, communication interfaces and installation environment.<\/p>\n<p>For a 3\/3 phase UPS, confirm that both the site electrical supply and protected critical loads require three-phase power.<\/p>\n<p>Provide DAXIN ENERGY with the load list, single-line diagram, site voltage, required runtime, redundancy requirements, communication interfaces and installation conditions for project configuration.<\/p>\n<h2>\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n<h3>\u0647\u0644 \u064a\u0645\u0643\u0646 \u062a\u062e\u0635\u064a\u0635 \u0647\u0630\u0627 \u0627\u0644\u0645\u0646\u062a\u062c \u0644\u0645\u0634\u0631\u0648\u0639 \u0645\u0639\u064a\u0646\u061f<\/h3>\n<p>\u0646\u0639\u0645. \u064a\u0645\u0643\u0646 \u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u062a\u0643\u0648\u064a\u0646 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u060c \u0648\u0645\u062f\u0629 \u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0628\u0637\u0627\u0631\u064a\u0629\u060c \u0648\u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0627\u062a\u0635\u0627\u0644\u0627\u062a\u060c \u0648\u0646\u0638\u0627\u0645 \u0627\u0644\u062a\u062c\u0627\u0648\u0632\u060c \u0648\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u062e\u0632\u0627\u0646\u0627\u062a\u060c \u0648\u0645\u0644\u062d\u0642\u0627\u062a \u0627\u0644\u0645\u0634\u0631\u0648\u0639\u060c \u0648\u0641\u0642\u064b\u0627 \u0644\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0645\u0648\u0642\u0639.<\/p>\n<h3>\u0647\u0644 \u064a\u062a\u0645 \u062a\u0637\u0628\u064a\u0642 \u062c\u0645\u064a\u0639 \u0627\u0644\u062a\u0635\u0646\u064a\u0641\u0627\u062a \u0627\u0644\u0641\u0646\u064a\u0629 \u0639\u0644\u0649 \u0627\u0644\u0633\u0644\u0633\u0644\u0629 \u0628\u0623\u0643\u0645\u0644\u0647\u0627\u061f<\/h3>\n<p>\u0644\u0627. \u062a\u062e\u062a\u0644\u0641 \u0627\u0644\u0642\u064a\u0645 \u0627\u0644\u062a\u0635\u0646\u064a\u0641\u064a\u0629 \u0648\u0627\u0644\u0648\u0638\u0627\u0626\u0641 \u0628\u0627\u062e\u062a\u0644\u0627\u0641 \u0627\u0644\u0637\u0631\u0627\u0632 \u0648\u0627\u0644\u062a\u0643\u0648\u064a\u0646. \u064a\u0631\u062c\u0649 \u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u0649 \u0648\u0631\u0642\u0629 \u0627\u0644\u0645\u0648\u0627\u0635\u0641\u0627\u062a \u0627\u0644\u0641\u0646\u064a\u0629 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0643\u0645\u0631\u062c\u0639 \u0646\u0647\u0627\u0626\u064a.<\/p>\n<h3>\u0647\u0644 \u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u0643\u0629 \u00ab\u062f\u0627\u0643\u0633\u064a\u0646 \u0625\u0646\u064a\u0631\u062c\u064a\u00bb \u062a\u0642\u062f\u064a\u0645 \u0627\u0644\u062f\u0639\u0645 \u0641\u064a \u0627\u062e\u062a\u064a\u0627\u0631 \u0627\u0644\u0646\u0638\u0627\u0645\u061f<\/h3>\n<p>\u0646\u0639\u0645. \u064a\u0631\u062c\u0649 \u062a\u0642\u062f\u064a\u0645 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0623\u062d\u0645\u0627\u0644\u060c \u0648\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0637\u0648\u0631 \u0648\u0627\u0644\u062c\u0647\u062f \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u060c \u0648\u0645\u062f\u0629 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629\u060c \u0648\u0627\u0644\u0647\u062f\u0641 \u0627\u0644\u0645\u062d\u062f\u062f \u0644\u0644\u062a\u0643\u0631\u0627\u0631\u060c \u0648\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0627\u062a\u0635\u0627\u0644\u060c \u0648\u0628\u064a\u0626\u0629 \u0627\u0644\u062a\u0631\u0643\u064a\u0628.<\/p>\n<h2>\u0637\u0644\u0628 \u062a\u0643\u0648\u064a\u0646 \u0645\u0634\u0631\u0648\u0639<\/h2>\n<p>\u064a\u0631\u062c\u0649 \u0625\u0631\u0633\u0627\u0644 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062d\u0645\u0644\u060c \u0648\u0627\u0644\u0631\u0633\u0645 \u0627\u0644\u062a\u062e\u0637\u064a\u0637\u064a \u0623\u062d\u0627\u062f\u064a \u0627\u0644\u062e\u0637\u060c \u0648\u0648\u0642\u062a \u0627\u0644\u0646\u0633\u062e \u0627\u0644\u0627\u062d\u062a\u064a\u0627\u0637\u064a \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u060c \u0648\u0638\u0631\u0648\u0641 \u0627\u0644\u0645\u0648\u0642\u0639 \u0644\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649 \u0639\u0631\u0636 \u0645\u062e\u0635\u0635 \u0644\u062c\u0647\u0627\u0632 UPS \u0623\u0648 \u0627\u0644\u0628\u0637\u0627\u0631\u064a\u0627\u062a.<\/p>\n<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"7445\" data-end=\"7547\"><strong data-start=\"7445\" data-end=\"7499\">What is the rated capacity of the DAXIN 3H3 40kVA?<\/strong><br data-start=\"7499\" data-end=\"7502\" \/>The reference model is rated at 40kVA \/ 32kW.<\/p>\n<p data-start=\"7549\" data-end=\"7653\"><strong data-start=\"7549\" data-end=\"7578\">What does 3\/3 phase mean?<\/strong><br data-start=\"7578\" data-end=\"7581\" \/>It means the UPS uses three-phase input and provides three-phase output.<\/p>\n<p data-start=\"7655\" data-end=\"7769\"><strong data-start=\"7655\" data-end=\"7702\">What is the mains-to-battery transfer time?<\/strong><br data-start=\"7702\" data-end=\"7705\" \/>The reference specification lists 0ms mains-to-battery transfer.<\/p>\n<p data-start=\"7771\" data-end=\"7890\"><strong data-start=\"7771\" data-end=\"7816\">What output voltage does the UPS support?<\/strong><br data-start=\"7816\" data-end=\"7819\" \/>The reference configuration supports 380\/400\/415VAC three-phase output.<\/p>\n<p data-start=\"7892\" data-end=\"8072\"><strong data-start=\"7892\" data-end=\"7928\">How should a 40kVA UPS be sized?<\/strong><br data-start=\"7928\" data-end=\"7931\" \/>UPS sizing should consider actual load in kW and kVA, power factor, peak demand, future expansion, operating margin and required backup time.<\/p>\n<p data-start=\"8074\" data-end=\"8269\"><strong data-start=\"8074\" data-end=\"8125\">Does the 40kVA UPS support parallel redundancy?<\/strong><br data-start=\"8125\" data-end=\"8128\" \/>Parallel and redundancy capabilities depend on the selected configuration and must be confirmed against the approved technical specification.<\/p>","protected":false},"excerpt":{"rendered":"<p>The DAXIN 3H3 40kVA is a 40kVA\/32kW low-frequency 3\/3 phase online UPS designed for critical applications requiring three-phase input and three-phase output. Featuring online power protection, 0ms mains-to-battery transfer and project-configurable battery, bypass and monitoring options, it is suitable for industrial facilities, data centers, telecom infrastructure, transportation, healthcare and other critical three-phase loads.<\/p>","protected":false},"featured_media":4908,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[622,46],"product_cat":[109,99,97],"product_tag":[],"class_list":["post-2950","product","type-product","status-publish","has-post-thumbnail","product_brand-daxin-energy","product_brand-szdxzh","product_cat-low-frequency-3-3-phase-ups","product_cat-low-frequency-ups","product_cat-ups-solutions","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/product\/2950","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/comments?post=2950"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/media\/4908"}],"wp:attachment":[{"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/media?parent=2950"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/product_brand?post=2950"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/product_cat?post=2950"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/btrytech.com\/ar\/wp-json\/wp\/v2\/product_tag?post=2950"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}